Overview

Freight car wheel sets can easily be exchanged due to their simple removal process from their truck

Removal of wheelsets from transit and LRT vehicles depends on the complexity of the removal process per transit vehicle's manufacturers design. Therefore customizing your split rail equipment is an important step to efficient design. Split rail systems require the use of a raised rail track section for the removal procedure.
Our battery-powered lifting carts (hydraulic or screw lift) travel between the raised rails to pre-set multiple rail opening areas along the track for precise positioning every time.

Currently there are four main designs of our past systems:

  1. Rails manually removed at multiple track locations, Powered Cart lowers and rotates wheelset 

  2. Rails automatically lower at multiple track locations, Powered Cart lowers and rotates wheelset

  3. Rails manually swung open at single track location, Powered Cart lowers wheelset and cart traverses

  4. Rails manually swung open at multiple track locations, Powered Cart lowers wheelset

 

Based on your facility layout, we can design a system for your application.

Features

Our designs are based on our customer's requirements:

  • Capacities 
  • Lengths/widths/diameters
  • Available ship spacing

For more information please click on our Split-rail brochure or use our contact form and our sales team will reply promptly to assist you.

For more information on the Split Rail Systems or other solutions

Contact Us

Product Videos