Overview

This steel coil handling equipment was designed to handle a uniform load of steel coil managing 2 Cycles per shift / 2 shifts per day / 1450 cycles per year.

Engineered for strength and structural rigidity, this four-post lift operates via 4 ball screws and is capable of lifting up to  100,000 lbs.

Features

  • 1 fixed Pendant station
  • Full safety package including upper, lower and over travel limit switches

For more information on the Steel Coil Handling Equipment or other solutions

Contact Us